public void setGregorianChange (Date date)

Sets the GregorianCalendar change date. This is the point when the switch from Julian dates to Gregorian dates occurred. Default is October 15, 1582 (Gregorian). Previous to this, dates will be in the Julian calendar.

To obtain a pure Julian calendar, set the change date to Date(Long.MAX_VALUE). To obtain a pure Gregorian calendar, set the change date to Date(Long.MIN_VALUE).

Parameters:
date    the given Gregorian cutover date.